| Supermarket Shelves 2007-10-11 |
Features: 1) Dimensions: a) Single side (L x W x H): 1,200 x 550 x 2,000mm b) Double side (L x W x H): 1,200 x 1,100 x 2,000mm 2) 4 x 8 square pipe 3) Iron back 4) Base shelf: 550mm wide 5) 5 layers
Packing: Carton |
|
| Shopping Trolley 2007-10-11 |
Features: 1) Volume: 100L 2) Bearing: 100kg 3) Wheel: 4" 4) Different sizes and types available |
|
| Drive-In Racking 2007-9-27 |
| It is designed for storing a few varieties and large quantities of similar goods with very high space utilization. Goods are stored and removed from the same side, or done from the opposite side in accordance with the "first-in first-out) principle, It's especially suitable for standard goods unit. ...... |
|
| Mezzanine 2007-9-27 |
| All composite racking structure; patented light-steel floor panel structure; locked by another patented parts which leads to an integrated smooth floor panel with high load capacity; low cost; quick installation. It can be designed into one layer or multi layers according to actual requirement, and...... |
|
| Pallet Racking 2007-9-27 |
We can supply many sections with different thickness: Post: 80*60, 90*70, 100*70,120*87, 140*87 Capacity per day: 8000-28,000kg Box beam: 80*40,100*50,120*50,140*50 Capacity per level: Max. 3000kg for 3 connectors Max. 4000kg for 4 connectors
Packing: Bulk, wrapp...... |
|
| Light Duty Rack 2007-9-27 |
Pitch: 50mm Post: 38x38x1.8cm Height: 1.5-2m Standard depth and width: 900x300, 900x450, 900x600, 1200x450, 1200x600, 1500x450, 1500x600, 1800x450, 1800x600mm |
|
| Medium Duty Racking 2007-9-27 |
Cut-in composite structure, standard cut-in units, installation and disassemblation is simple and quick, ultra high-strength steel panel by continuous punching and rolling, panel width can be composited freely, panel width can be composited freely, there are grooves in front of the panel for cut-...... |
|
| Material Bin 2007-9-27 |
| Material bin is developed on the basis of the tray, and used for spare parts bulkpackaging materials. Generally lower part can be installed by forklift, the upperpart can be hoisted, and can be carried out the stack (usually four floors). |
|
|